Engineering

On these achievements we build our success!

Our engineering team will ensure that the operation of your waste heat power plant has a positive impact on your site.

The goals of our work for you are:

  • The waste heat power plant does not influence the operation of the waste heat source
  • The waste heat power plant does not cause any additional operating expenses
  • The waste heat power plant is integrated into the site in such a way that operational processes run undisturbed
  • Waste heat is converted into the form of energy that makes the most sense for your site: Electricity, compressed air or cold. Always in the quality you need!
  • The useful heat of the waste waste heat power plant must be integrated as far as possible

Customised according to your requirements

Analysis of your requirements and prerequisites

Together with you, we analyse your individual requirements and evaluate the local and technical conditions.

Planning and feasibility studies

In order to ensure the sustainable and promising realisation of your waste heat power plant, our experts conduct comprehensive planning and feasibility studies prior to the start of your project.

Funding application and approval process

We support you in your funding application and approval procedures and provide you with useful expert tips.

Detailed planning of your waste heat power plant

Your individual waste heat power plant is first planned in detail by our engineers and adapted to your specific requirements.

Optimization in the face of changing framework conditions

Should there be a change in the general conditions before, during or after your project, we will always realise a corresponding optimisation of your waste heat power plant.

Interest aroused?

More about our products & services

INTEREST AROUSED?

Contact us!
info@devetec.de | +49 (0) 6894 895950